News

Fuel Farm Now Open at the Global Transpark!

Steve Drucker
February 25, 2025

Fuel Farm Construction Complete: Expanding Capacity at NC Global TransPark

The North Carolina Global TransPark (GTP) is made significant strides in the construction of its new fuel farm, an essential addition to its state-of-the-art aviation infrastructure. Strategically located next to the airport’s expansive 11,500-foot runway, this facility is designed to meet the growing fuel service demands driven by recent tenant expansions and anticipated future growth in the aerospace sector. The farm replaces a

A Modern Fuel Facility

The new fuel farm features three vertical steel tanks with a total capacity of 500,000 gallons, making it a pivotal upgrade to the airport’s fuel service capabilities. This advanced facility will provide enhanced control and monitoring of fuel inventories, ensuring a reliable supply for aircraft operations. The project underscores the GTP’s commitment to maintaining and upgrading its infrastructure to support the evolving needs of the aerospace industry.

Construction Progress

The project has seen steady progress, thanks to favorable weather conditions and efficient project management. Key milestones include:

  • Underground Line Installation: All underground fuel lines have been installed, forming the backbone of the system.
  • Foundation Pads: Concrete foundation pads have been poured and are ready to support the steel tanks.
  • Tank Construction: The construction of three vertical steel tanks is well underway. These tanks, made from welded steel plates, are designed for durability and efficiency.
  • Retaining Wall: A rubber membrane-lined concrete retaining wall is being constructed to contain potential spills, emphasizing safety and environmental stewardship.

A Commitment to Growth

This project demonstrates the NC Global TransPark’s dedication to investing in infrastructure that meets the needs of today’s aviation and aerospace industries while preparing for tomorrow’s opportunities. The new fuel farm  not only bolsters operational reliability but also solidify the GTP’s position as a critical hub for aerospace development in the region.